Double Tapered Mixer - China Suppliers & Factory for Efficient Powder and Grain Mixing Solutions
Technical Parameters
| SZH SERIES DOUBLE TAPERED MIXER | |||||||||||
| Model | SZH-0.3 | SZH-0.5 | SZH-1.0 | SZH-1.5 | SZH-2.0 | SZH-2.5 | SZH-3.0 | SZH-4.0 | SZH-5.0 | SZH-6.0 | SZH-10 |
| Productive capacity (kg/h) | 120 | 200 | 400 | 600 | 800 | 1000 | 1200 | 1600 | 2000 | 2400 | 4000 |
| Time of raw material fed in (min) | 3-5 | 4-6 | 6-9 | 6-10 | 8-13 | 8-15 | 8-12 | 10-15 | 15-20 | 18-25 | 20-30 |
| Mixing time (min) | 4-8 | 4-8 | 6-15 | 6-15 | 6-15 | 6-15 | 8-20 | 8-20 | 8-20 | 8-20 | 8-20 |
| Total volume (m³) | 0.3 | 0.5 | 1.0 | 1.5 | 2.0 | 2.5 | 3.0 | 4.0 | 5.0 | 6.0 | 10 |
| Stirring speed (rpm) | 20 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 10 | 8 |
| Power of motor (kw) | 1.1 | 2.2 | 4 | 4 | 5 | 7.5 | 7.5 | 11 | 15 | 18.5 | 30 |
Frequently Asked Questions
Q: What is the production capacity range of the SZH Series Double Tapered Mixer?
The production capacity of the SZH Series ranges from 120 kg/h for the compact SZH-0.3 model up to 4,000 kg/h for the large-scale industrial SZH-10 model, accommodating various production scales.
Q: How long does the mixing cycle take for these double tapered mixers?
Typically, the mixing process is highly efficient. Smaller models (SZH-0.3 to SZH-0.5) take about 4 to 8 minutes, while mid-to-large models require between 6 to 15 minutes or 8 to 20 minutes depending on the material characteristics.
Q: What are the motor power requirements for the SZH-1.0 and SZH-2.0 models?
The SZH-1.0 model is equipped with a 4 kW motor, while the larger SZH-2.0 model operates on a 5 kW motor to ensure stable and consistent stirring performance.
Q: What is the total volume capacity of the SZH-3.0 and SZH-5.0 models?
The SZH-3.0 model features a total volume capacity of 3.0 m³, whereas the SZH-5.0 model offers a larger volume capacity of 5.0 m³ for high-volume mixing requirements.
Q: How long does the raw material feeding process take?
The feeding time depends on the machine's volume. It ranges from 3-5 minutes for smaller units (SZH-0.3) to 20-30 minutes for the largest model (SZH-10) to ensure safe and proper loading.

